Environmental Case Studies

Peterscroft & Lilac Cottages, Manchester Airport

Complete Demolition undertook asbestos removal and demolition works on two cottages in close proximity to Manchester Airport for Galliford Try Infrastucture. Full demolition took place on the sites to enable the main contractor to create new airport car parking. Prior to works commencing a tubular steel access scaffold was erected to the full perimeter of… Read more »

Riverside House Care Home, Penkridge

Complete Demolition were appointed as Principal Contractor for the full demolition works on a former Care Home and bungalows in Penkridge, Staffordshire. The scope of works included the removal of the notifiable asbestos under fully controlled conditions, a comprehensive soft-strip, full mechanical demolition and crushing of materials. Due to the location of the site which… Read more »

Church Walk, Knutsford

Complete Demolition carried out the specialist demolition works on a variety of structures on Church Walk, Knutsford. Works commenced with the removal of non-notifiable asbestos, which was followed by mechanical demolition of a selection of the redundant buildings. A section of the boundary wall that forms the river wall was open with no concrete covers. … Read more »

The Grain Store, Cheshire

Complete Demolition carried out specialist demolition works on a steel framed structure with a pitched cement asbestos clad roof which was formally used as a grain store. There was a badger set to the southern boundary of the site. The badger set was outside the 20 metre exclusion zone for demolition. However, prior to any… Read more »

Waters Mass Spectrometry, Wilmslow

Complete Demolition carried out the full demolition of the office block on Waters Mass in Wilmslow for Vinci Construction.  The works included the removal of roof tiles and features under the full supervision of the site ecologist to collect, shelter and then re-house the bats that were roosting within the roof structure.  Over 20 bats… Read more »

Pollard St, Ancoats

Complete Demolition completed works onsite at Pollard St, Ancoats, Manchester. Acting as Principal Contractor on the project, Complete Demolition demolished a derelict 3 storey building which stood just 25m from a metro link station, on a busy pedestrian street. Prior to demolition, an ecologist carried out a bat survey.  The building was then cleared of… Read more »