Deconstruction & Dismantling Case Studies

Vitafoam Factory, Manchester

Complete Demolition was appointed as Principal Contractor for the extensive dismantling works at the Vitafoam factory, located adjacent to the River Irk, Middleton, Manchester. The project involved the dismantling of 5 steel framed structures  and the mechanical demolition of 20m steel tower, which were part covered with asbestos sheet cladding. The specialist demolition team completed… Read more »

Masonic Lodge, Chorlton

Complete Demolition carried out the specialist demolition works on the former Masonic Lodge in Chorlton, Manchester for Cruden Construction. Demolition equipment delicately dismantled the structure.  The main facade of the original Victorian Building was retained to ensure the character and history of the lodge remained.  The experienced site team set about separating the facade from… Read more »

Hawes Side School, Blackpool

Complete Demolition was appointed to carry out the full demolition of Hawes Side School in Blackpool for Morgan Sindall, following completion of the new school. Asbestos was removed under fully licensed conditions from numerous locations in the school.  Works then commenced with the hand demolition of a 2 storey overhang which was undertaken out of… Read more »

The Salvation Army, Stockport

Complete Demolition’s experienced team of demolition operatives carried out hand demolition works and façade retention to the former Salvation Army Citadel in Stockport.  The works consisted of full retention of the listed façade, careful hand demolition including separation before the remainder of the building was demolished using a demolition excavator fitted with specialist attachments. Due… Read more »

Ladysmith Shopping Centre

Complete Demolition were appointed by Manchester & Cheshire Construction to undertake specialist demolition works on Ladysmith Shopping Centre, Ashton-under-Lyne.  The shopping centre comprises an open mall providing approx. 169,000 sq ft of well configured retail space and a 200 multi-storey car park attracting over 8 million shoppers per annum. The works included removal of ceilings… Read more »

Connahs Quay School

Complete Demolition was appointed by Kier Construction to carry out the specialist demolition works on Connahs Quay High School in North Wales. The project included deconstruction of sections of single and 2 storey steel framed structures and mechanical demolition of a concrete framed building.  The specialist demolition crew commenced with the hand demolition works to… Read more »