Monton House Hotel, Salford

Complete Demolition were appointed as the Principal Contractor for the demolition of a former hotel with 60 bedrooms across three floors. Works were carried out for McCarthy & Stone.

The mechanical demolition of the buildings was carried out using two 30 tonne excavators fitted with specialist demolition attachments. Prior to the demolition the buildings were cleared of loose fixtures and fittings. The asbestos containing materials were removed under fully controlled conditions and then the buildings were soft-stripped of materials such as carpets, ceiling tiles and grid ceilings.